Installation
Eight steps with the main breaker off.
The incoming cables stay live even with the main breaker off. If you are unsure, ask an electrician.
Before you start
- You or an electricianFitting takes the main breaker off
- 50 Hz, single-phaseOne clamp and one voltage lead
- 6 mm of DIN railFree space beside the main breaker
- 2.4 GHz Wi‑FiReaching the fuse box
Set up the app
- Install the appSign in and add your home
- PairThe app finds the sensor
- ConnectChoose your Wi‑Fi
- DoneLive readings appear
Know which devices are running at home
- Nothing to pay today
- 2-year warranty
- No subscription

